Department of Industrial and Engineering Technology
Texas A&M University-Commerce Abstract: Total Productive Maintenance (TPM) is a maintenance
program which involves a newly defined concept for maintaining plants and equipment. The goal of the TPM program
is to markedly increase production while, at the same time, increasing employee morale and
job satisfaction. The TPM program closely resembles the popular Total Quality Management
(TQM) program. Many of the same tools such as employee empowerment, benchmarking,
documentation, etc. are used to implement and optimize TPM. This paper will define TPM in some detail, evaluate its strengths and
weaknesses as a maintenance philosophy, and discuss
implementation procedures. Examples of successfully implemented programs will be
presented.
I. What is
Total Productive Maintenance?
Total Productive
Maintenance (TPM) is a maintenance program concept. Philosophically, TPM resembles Total
Quality Management (TQM) in several aspects, such as (1)total commitment to the program by
upper level management is required, (2) employees must be empowered to initiate corrective
action, and (3) a long range outlook must be accepted as TPM may take a year or more to
implement and is an on-going process. Changes in employee mind-set toward their job
responsibilities must take place as well.
TPM
brings maintenance into focus as a necessary and vitally important part of the business.
It is no longer regarded as a non-profit activity. Down time for maintenance is scheduled
as a part of the manufacturing day and, in some
cases, as an integral part of the manufacturing process. It is no longer simply squeezed in whenever there is a break in material flow.
The goal is to hold emergency and
unscheduled maintenance to a minimum.
II. When and
where did TPM originate?
TPM evolved from TQM,
which evolved as a direct result of Dr. W. Edwards Deming's influence on Japanese industry. Dr. Deming began his work in Japan shortly
after World War II. As a statistician, Dr. Deming
initially began to show the Japanese how to use statistical analysis in manufacturing and
how to use the resulting data to control quality
during manufacturing. The initial statistical procedures and the resulting quality control concepts fueled by the Japanese work ethic soon
became a way of life for Japanese industry. This
new manufacturing concept eventually became knows as Total Quality Management or TQM.
When the problems of
plant maintenance were examined as a part of the TQM program, some of the general concepts did not seem to fit or work well in the
maintenance environment. Preventative maintenance (PM) procedures had been in place for
some time and PM was practiced in most plants. Using PM techniques, maintenance schedules
designed to keep machines operational were developed. However, this technique often
resulted in machines being over-serviced in an attempt to improve production. The thought
was often "if a little oil is good, a lot should be better." Manufacturer's
maintenance schedules had to be followed to the letter with little thought as to the
realistic requirements of the machine. There was little or no involvement of the machine
operator in the maintenance program and maintenance personnel had little training beyond
what was contained in often inadequate maintenance manuals.
The need to go
further than just scheduling maintenance in accordance with manufacturer's recommendations as a method of improving productivity and
product quality was quickly recognized by those companies who were committed to the TQM
programs. To solve this problem and still adhere to the TQM concepts, modifications were
made to the original TQM concepts. These modifications elevated maintenance to the status
of being an integral part of the overall quality program.
The origin of the
term "Total Productive Maintenance" is disputed. Some say that it was first
coined by American manufacturers over forty years
ago. Others contribute its origin to a maintenance program used in the late 1960's by
Nippondenso, a Japanese manufacturer of automotive electrical parts. Seiichi
Nakajima, an officer with the Institute of Plant
Maintenance in Japan is credited with defining the concepts
of TPM and seeing it implemented in hundreds of plants in Japan.
Books
and articles on TPM by Mr. Nakajima and other Japanese as well as American authors began
appearing in the late 1980's. The first widely attended TPM conference held in the United
States occurred in 1990. Today, several consulting companies routinely offer TPM
conferences as well as provide consulting and coordination services for companies wishing
to start a TPM program in their plants.
III.
Implementation of TPM
To begin applying TPM
concepts to plant maintenance activities, the entire work force must first be convinced
that upper level management is committed to the program. The first step in this effort is
to either hire or appoint a TPM coordinator. It is the responsibility of the coordinator
to sell the TPM concepts to the work force through an educational program. To do a
thorough job of educating and convincing the work force that TPM is just not another
"program of the month," will take time, perhaps a year or more.
Once the coordinator
is convinced that the work force is sold on the TPM program and that they understand it
and its implications, the first study and action teams are formed. These teams are usually
made up of people who directly have an impact on the problem being addressed. Operators,
maintenance personnel, shift supervisors, schedulers, and upper management might all be
included on a team. Each person becomes a "stakeholder" in the process and is
encouraged to do his or her best to contribute to the success of the team effort. Usually,
the TPM coordinator heads the teams until others become familiar with the process and
natural team leaders emerge.
Total Productive
Maintenance action teams are
charged with the responsibility of pinpointing problem areas, detailing a course of corrective action, and initiating the corrective process.
Recognizing problems and initiating solutions may not
come easily for some team members. They will not have had experiences in other plants
where they had opportunities to see how things
could be done differently. In well run TPM programs, team members often visit cooperating plants to observe and compare TPM methods,
techniques, and to observe work in progress. This
comparative process is part of an overall measurement technique called
"benchmarking" and is one of the greatest assets of the TPM program.
TPM teams are
encouraged to start on small problems and keep meticulous records of their progress.
Successful completion of the team's initial work is always
recognized by management. Publicity of the program
and its results are one of the secrets of making the program a success. Once the teams are
familiar with the TPM process and have experienced success with a small problem, problems
of ever increasing importance and complexity are addressed.
As an example, in one
manufacturing plant, one punch press was selected as a problem area. The machine was
studied and evaluated in extreme detail by the team. Production over an extended period of
time was used to establish a record of productive time versus nonproductive time. Some
team members visited a plant several states away which had a similar press but which was
operating much more efficiently. This visit gave them ideas on how their situation could
be improved. A course of action to bring the machine into a "world class"
manufacturing condition was soon designed and work was initiated. The work involved taking
the machine out of service for cleaning, painting, adjustment, and replacement of worn
parts, belts, hoses, etc. As a part of this process, training in operation and maintenance
of the machine was reviewed. A daily check list of maintenance duties to be performed by
the operator was developed. A factory representative was called in to assist in some
phases of the process. Total Productive Maintenance was just the right fit
for the situation
After success has
been demonstrated on one machine and records began to show how much the process had
improved production, another machine was selected, then another, until the entire
production area had been brought into a "world class" condition and is producing
at a significantly higher rate.
Note that in the
example above, the operator was required to take an active part in the maintenance of the machine. This is one of the basic innovations of TPM.
The attitude of "I just operate it!" is no longer acceptable. Routine daily maintenance checks, minor adjustments,
lubrication, and minor part change out become the responsibility of the operator.
Extensive overhauls and major breakdowns are handled by plant maintenance personnel with the operator assisting. Even if outside
maintenance or factory experts have to be called in, the equipment operator must play a
significant part in the repair process. Training for TPM
coordinators is available from several sources. Most of the major professional
organizations associated with manufacturing as well as private consulting and educational
groups have information available on TPM implementation. The Society of Manufacturing
Engineers (SME) and Productivity Press are two examples. Both offer tapes, books, and
other educational material that tell the story of TPM. Productivity Press conducts
frequent seminars in most major cities around the United States. They also sponsor plant
tours for benchmarking and training purposes.
IV. The Results of
Total Productive Maintenance
Ford, Eastman Kodak,
Dana Corp., Allen Bradley, Harley Davidson; these are just a few of the companies that have implemented TPM successfully. All report an
increase in productivity using TPM.
Kodak reported that a $5 million investment resulted in a
$16 million increase in profits which could be traced and directly contributed to
implementing a TPM program. One appliance manufacturer reported the time required for die changes on a forming press went from several
hours down to twenty minutes!
This is the same as having two or three additional million
dollar machines available for use on a daily basis
without having to buy or lease them. Texas Instruments reported increased production
figures of up to 80% in some areas. Almost all the
above named companies reported 50% or greater reduction in
down time, reduced spare parts inventory, and increased
on-time deliveries. The need for out-sourcing part
or all of a product line was greatly reduced in many cases. Continued
below...
V. Conclusion
Today, with
competition in industry at an all time high, Total Productive Maintenance may be the only thing that stands between success and total failure for some companies. It has been
proven to be a program that works. It can be adapted
to work not only in industrial plants, but in construction, building maintenance,
transportation, and in a variety of other situations. Employees must be
educated and convinced that TPM is not just another "program of the month" and
that management is totally committed to the program and the extended time frame necessary
for full implementation. If everyone involved in a TPM program does his or her part, an
unusually high rate of return compared to resources invested may be expected.
VI. References:
Links to the books are active and let you
close and return to TPMonLine Group.
1. Productivity
Press, Inc., P.O. Box 13390, Portland, OR 97213-0390
At No Cost
to You!
You can support our website when you
visit our sponsors and advertisers and get interesting info from them.
They make it possible for us to keep this
free service up to date for you.